List of Available Type Plans of Bridges
-
Contents
A) Design Circle Type plans (2002)
- B) M.O.S.T/M.O.R.T.H. Volume (I) june 1991
- B) M.O.S.T/M.O.R.T.H. Volume (II) june 1991
- B) M.O.S.T/M.O.R.T.H. Volume (III) june 1991
- B) M.O.S.T/M.O.R.T.H. Old Volume (II)
- C) Rural Road Manual
- D) Railways
- E) IRC SP - 13/2004
- F) Bridge Type Plans for Super Structure year 2018
- G) Bridge type plans 2023
A) Design Circle Type plans (2002)
- Contents A) Design Circle Type plans (2002)
- B) M.O.S.T/M.O.R.T.H. Volume (I) june 1991
- B) M.O.S.T/M.O.R.T.H. Volume (II) june 1991
- B) M.O.S.T/M.O.R.T.H. Volume (III) june 1991
- B) M.O.S.T/M.O.R.T.H. Old Volume (II)
- C) Rural Road Manual
- D) Railways
- E) IRC SP - 13/2004
- F) Bridge Type Plans for Super Structure year 2018
- G) Bridge type plans 2023
Sr. No. | Component | span | Height | Founding strata | velocity | Bridge width | Skew Angle | Grade of concrete | Grade of steel |
---|---|---|---|---|---|---|---|---|---|
1 | Solid Slab | 3m to 10 m | i) 4.25 m | upto 30o | M-25 | Fe-415 | |||
ii) 6.00 m | |||||||||
iii) 7.50 m | |||||||||
iv) 12.00 m | |||||||||
2 | Piers | 3m to 10 m | i) Rock | 2 | upto 30o | M-15 | Fe-415 | ||
3 | |||||||||
4 | |||||||||
5 | |||||||||
6 | |||||||||
ii) Soil | 3 | ||||||||
4.5 | |||||||||
3 | Abutment | 3 | 3 | (i) Rock (ii) soil and iii) Raft | upto 30o | M-15 | Fe-415 | ||
4 | |||||||||
4 | 3 | ||||||||
4 | |||||||||
5 | |||||||||
5 | 3 | ||||||||
4 | |||||||||
5 | |||||||||
6 | |||||||||
6 | 3 | ||||||||
4.5 | |||||||||
6 | |||||||||
7.5 | |||||||||
7 | 4 | ||||||||
5.5 | |||||||||
7 | |||||||||
8.5 | |||||||||
8 | 4.5 | ||||||||
6 | |||||||||
7.5 | |||||||||
9 | |||||||||
9 | 4.5 | ||||||||
6 | |||||||||
7.5 | |||||||||
9 | |||||||||
10 | |||||||||
10 | 5 | ||||||||
6.5 | |||||||||
8 | |||||||||
9.5 | |||||||||
11 | |||||||||
4 | Raft Foundations | 3m to 5 m | upto 30o | M-20 | Fe-415 | ||||
6m to 10 m | upto 30o | M-25 | |||||||
5 | Arch Causeway | Raft/Open | i) 6.00 m | M-25 | Fe-415 | ||||
ii) 9.0 m | |||||||||
iii) 12.00 m | |||||||||
6 | Box cell | 2mx2m to 6mx6m | M-25 | Fe-415 | |||||
7 | Spine slab | Span length 11m to 20m | M-25 | Fe-415 | |||||
8 | Skew Slab | 3m to 10 m | upto 30o | M-25 | Fe-415 |
B) M.O.S.T/M.O.R.T.H. Volume (I) june 1991
Sr. No. | Component | span | Depth of superstructure (m) | Girder Spacing (m) | Bridge width (m) | Deck slab Thk (mm) | Grade of concrete | Grade of steel | Year |
---|---|---|---|---|---|---|---|---|---|
1 | PSC girder + RC slab | 30m w/o FP | 2.5 | 2.5 | 8.23 | 295 | M-40 | Fe-415 | 33390 |
30m with FP | 2.5 | 3 | 11.23 | 295 | M-40 | Fe-415 | 33390 | ||
35m with fp | 2.95 | 3 | 11.23 | 295 | M-40 | Fe-415 | 33390 | ||
40m w/o fp | 3.35 | 2.5 | 8.23 | 295 | M-40 | Fe-415 | 33390 |
B) M.O.S.T/M.O.R.T.H. Volume (II) june 1991
Sr. No. | Component | span | Depth of superstructure (m) | Girder Spacing (m) | Bridge width (m) | Deck slab Thk (mm) | Grade of concrete | Grade of steel | Year |
---|---|---|---|---|---|---|---|---|---|
2 | Slab w/o fp | 3m to 10 m | 11.45 | 295 | M-25 | Fe-415 | |||
Slab with fp | 3m to 10 m | 12 | 295 | M-30 | Fe-415 |
B) M.O.S.T/M.O.R.T.H. Volume (III) june 1991
Sr. No. | Component | span | type of bearing | Girder Spacing (m) | Bridge width (m) | Deck slab Thk (mm) | Grade of concrete | Grade of steel | Year |
---|---|---|---|---|---|---|---|---|---|
3 | RCC T beam + slab | 10 | Rocker and roller | 2.65 | 12 | 336 | M-25 moderate and M-30 severe | Fe-415 | |
12 | Rocker and roller | 2.65 | 12 | 336 | M-25 moderate & M-30 severe | Fe-416 | |||
14 | Rocker and roller | 2.65 | 12 | 336 | M-25 moderate & M-30 severe | Fe-417 | |||
16 | Rocker and roller | 2.65 | 12 | 336 | M-25 moderate & M-30 severe | Fe-418 | |||
18 | Elastomeric | 2.65 | 12 | 336 | M-25 moderate & M-30 severe | Fe-419 | |||
21 | Elastomeric | 2.65 | 12 | 336 | M-25 moderate & M-30 severe | Fe-420 | |||
24 | Elastomeric | 2.65 | 12 | 336 | M-25 moderate & M-30 severe | Fe-421 |
B) M.O.S.T/M.O.R.T.H. Old Volume (II)
Sr. No. | Component | span | Depth of superstructure (m) | Girder Spacing (m) | Bridge width (m) | Deck slab Thk (mm) | Grade of concrete | Grade of steel | Year |
---|---|---|---|---|---|---|---|---|---|
4 | Slab w/o fp | 3.37m to 10.37 m | 7.5 | 15o | M-20 | Fe-415 | 1983 | ||
7.5 | 30o | ||||||||
7.5 | 45o | ||||||||
7.5 | 60o | ||||||||
Slab with fp | 3.37m to 10.37 m | 8.725 | 15o | M-20 | Fe-415 | 1983 | |||
8.725 | 30o | ||||||||
8.725 | 45o | ||||||||
8.725 | 60o |
C) Rural Road Manual
Sr. No. | Component | span | Height | Foundation | Bridge width (m) | Carriage way | Grade of concrete | Grade of steel | Year |
---|---|---|---|---|---|---|---|---|---|
1 | Pipe Culvert | i) 4.25 m | |||||||
ii) 6.00 m | |||||||||
iii) 7.50 m | |||||||||
iv) 12.00 m | |||||||||
2 | Piers | upto7.5 m | i) 4.25 m | 1:1.5:3 | |||||
ii) 7.50 m | |||||||||
3 | Return wall & wing wall | ||||||||
4 | Masonry Arch Bridge | i) 6.00 m | |||||||
ii) 9.0 m | |||||||||
iii) 12.00 m | |||||||||
5 | Box cell | 2mx2m to 5mx5m | |||||||
6 | Bridges on Sandy bed | ||||||||
7 | Slab | 1.5 to 6m | 6 | 5.5 | M-25 | Fe-415 | |||
8 | 6 | 5.5 | M-20 | Fe-415 | |||||
10 | 6 | 5.5 | M-20 | Fe-415 | |||||
12 | 6 | 5.5 | M-20 | Fe-415 | |||||
15 | 6 | 5.5 | M-20 | Fe-415 | |||||
1.5 to 6m | 7.5 | 6.6 | M-25 | Fe-415 | |||||
8 | 7.5 | 6.6 | M-20 | Fe-415 | |||||
10 | 7.5 | 6.6 | M-20 | Fe-415 | |||||
12 | 7.5 | 6.6 | M-20 | Fe-415 | |||||
15 | 7.5 | 6.6 | M-20 | Fe-415 |
D) Railways
Sr. No. | Component | span | Lanes | No. Of Girders | Bridge width (m) | Carriage way | Grade of concrete | Grade of steel | Year |
---|---|---|---|---|---|---|---|---|---|
1 | girder + RC slab | 24 | 2 | 4 | 9.9 | ||||
2 | 4 | 10.1 | |||||||
2 | 4 | 11.8 | |||||||
3 | 5 | 12.9 | |||||||
3 | 5 | 13.4 | |||||||
3 | 6 | 14.8 | |||||||
2 | Bowstring + RC slab | 36 | 2 | Bowstring | 12 | ||||
2 | Bowstring | 12 | |||||||
2 | Bowstring | 12 | |||||||
3 | Bowstring | 12 | |||||||
3 | Bowstring | 12 | |||||||
3 | Bowstring | 12 | |||||||
3 | Bowstring + RC slab | 42 | 2 | Bowstring | 12 | ||||
2 | Bowstring | 12 | |||||||
2 | Bowstring | 12 | |||||||
3 | Bowstring | 12 | |||||||
3 | Bowstring | 12 | |||||||
3 | Bowstring | 12 | |||||||
4 | Bowstring + RC slab | 48 | 2 | Bowstring | 12 | ||||
2 | Bowstring | 12 | |||||||
2 | Bowstring | 12 | |||||||
3 | Bowstring | 12 | |||||||
3 | Bowstring | 12 | |||||||
3 | Bowstring | 12 |
E) IRC SP - 13/2004
Sr. No. | Component | span | with or w/o fp | earth cushion | Bridge width | Skew Angle | Grade of concrete | Grade of steel | Year |
---|---|---|---|---|---|---|---|---|---|
1 | RCC Solid Slab | 3m to 10 m | with | i) 4.25 m | M-25 | Fe-415 | 2004 | ||
ii) 6.00 m | |||||||||
iii) 7.50 m | |||||||||
iv) 12.00 m | |||||||||
2 | RCC Solid Slab | 3m to 10 m | w/o | i) 4.25 m | M-25 | Fe-415 | 2004 | ||
ii) 6.00 m | |||||||||
iii) 7.50 m | |||||||||
iv) 12.00 m | |||||||||
3 | Box cell | 2mx2m to 8mx7m | with | M-25 | Fe-415 | 2004 | |||
4 | Box cell | 2mx2m to 3mx3m | w/o | M-25 | Fe-415 | 2004 |
Working of Type Plans Maharashtra PWD Plan 2018 and 2023 in Progress